OSUNG 3 (id:11529)

3493
Category Hopper barge 
Inspection region Singapore Area 
Inspection country Korea, Republic of 
Classification KOMSA, COASTAL TRADING
Build Year 2018 
Build Place ZHEJING HEXING SHIPYARD CO LTD., CHINA
Flag Korea, Republic of
Ship added date 2026-07-07
Added by Brian Kim, BNC Shipbroking Co., Ltd

Measured weight

DWT 4838 
GRT 2690 
Displacement 6857

Ship dimensions

Length overall (LOA), m 91.05 
LBP 84.5
Depth, m 5.7
Vessel draft, m 4.25 
Speed 8

Additional Information

Main Engine WEICHAI XCW8200ZC-10
M/E power, kW 1401
Propellers FPP X 2 SETS, DIAMETER 3.1 M
Self-propelled
Delivery WITHIN 1 MONTH AFTER SIGNING CONTRACT

Dry Docking / Special Survey

DD last 2023-11-17
DD next 2028-11-16
SS last 2023-11-01
SS next 2028-11-01

Inspection

Inspection details NOV., 17, 2023 / NOV., 16, 2028
Sanctions screening Not screened



Sign in